GREEN

Industrial Project

Nile Sugar factory

 Scope of work:

    Process building

  1. Instrument cable pulling and termination (around 25 KM)
  2. Cable raceway erection, conduit and cable tray (around 2500 meters)
  3. Foundation Field bus junction box erection
  4. Flow meter transmitter erection

    Lime Killen building

  1. Cable raceway and cable tray erection
  2. All low voltage power cables pulling and termination
  3. All instrument cables pulling and termination

    AL AZABA building

  1. Turn key job for lighting system, supply, erection and startup

    Filtration new building

  1. Electrical and instrument system erection

Alex Fiber ( AFCO )

 Scope of work:

    Process building

  1. Instrument cable pulling and termination (around 25 KM)
  2. Cable raceway erection, conduit and cable tray (around 2500 meters)
  3. Foundation Field bus junction box erection
  4. Flow meter transmitter erection

    Lime Killen building

  1. Cable raceway and cable tray erection
  2. All low voltage power cables pulling and termination
  3. All instrument cables pulling and termination

    AL AZABA building

  1. Turn key job for lighting system, supply, erection and startup

    Filtration new building

  1. Electrical and instrument system erection

Nile Suez Textile factory

 Scope of work:

    All electrical installation and commissioning for the project

  1. Main Power distribution center
    • MV switchgear
    • Two LV Main distribution panels
    • Two power transformers each of 2000 KVA
    • Pulling and terminating MV cable
  2. LV distribution panel for production machine (15 panels)
  3. Site earthing network
  4. Site lighting network (around 450 fixtures)
  5. Site LV cable network for DB and Machine (18 KM)
  6. Cable raceway, cable tray and conduit installation
  7. Busbar duct for the machine (1500 meters)

INDORAMA Shebin el Kom Spinning factory Mill No 7

 Scope of work:

    All electrical installation and commissioning for the project

  1. Power distribution center No 3 (1500 KVA) includes
    • MV switchgear
    • LV Main distribution panel
    • Power transformer of 1500 KVA
    • Pulling and terminating MV cable
  2. LV distribution panel for production machine (11 panels)
    • Site earthing network
    • Site lighting network (around 3000 fixture)
  3. Site Humidification plant (5 units) including associated field instruments
    • Site LV cable network for DB and Machine (120 KM)
    • Cable raceway cable tray and conduit
    • Site Humidification plant (3 units) including field instruments

Tenth of Ramadan 220/66 KV substation

New Cairo 220/66 KV substation

Shekh Zaid 220/66 KV substation

 Scope of work:

    Installation, programming, commissioning and startup

  1. RTU erection, field wiring design, cable pulling and termination
  2. RTU programming, testing all I/O signals between field device and RTU
  3. Testing all I/O signals between RTU and National Electrical Control Center
  4. Testing all I/O signals between RTU and Regional electrical control center
  5. Preparing as built document and taking over certificate

BANY SOUIF cement factory

CEMEX Assuit cement factory

 Scope of work:

  1. Dismantle existing lubrication system for Killen including Lubrication pump, lubricant nozzle gate, cable, tubes etc.
  2. Erection and commissioning of a new automatic lubrication system including:
    • New two lubricant automatic control panels
    • New four lubricant nozzle gates
    • New two automatic lubricant filling pumps
    • New air and lubricant tubing
    • New cable raceway
    • Cable pulling and termination
    • Interfacing between the new lubricant control system and factory SCADA system

DP World EIN SHOKNA

 Scope of work:

  1. Annual contract for Periodic and corrective maintenance of electrical network
    • Medium voltage switchgear ( different type and supplier )
    • Transformer ( different type and supplier )
    • Low voltage main distribution board ( different type and supplier )

DIBE EGYPT FACTORY MOSTORD

 Scope of work:

  1. Periodic and corrective maintenance for electrical network
    • Medium voltage switchgear ( different type and supplier )
    • Transformer ( different type and supplier )
    • Low voltage main distribution board ( different type and supplier )

Egypt Expo & Convention Authority

 Scope of work:

  1. Transformers’ corrective maintenance and retrofit
    • Major corrective maintenance and retrofit for 13 transformers
    • Complete electrical testing for 13 transformers
    • Oil filtration for 5 transformers

Atomic Energy authority

 Scope of work:

  1. Annual contract for Transformers’ corrective maintenance and retrofit
    • major corrective maintenance and retrofit for 8 transformers
    • Complete electrical testing for 20 transformers

Zafran Wind Farm

 Scope of work:

  1. Periodic and corrective maintenance for Medium voltage grid ( Transformers and switchgear )
    • ZAFRAN Spanish wind farm 100 kiosks each contains MV switchgear and transformer
    • ZAFRAN KFW VI wind farm 94 kiosks each contains MV switchgear and transformer
    • ZAFRAN JBIC wind farm 142 kiosks each contains MV switchgear and transformer
    • ZAFRAN KF III wind farm 71 kiosks each contains MV switchgear and transformer