GREEN

Wind Farm

Zafaran 85 MW Wind farm (100 GAMESA G52 Turbine)

petrotec 026 petrotec 026

 Scope of work:

  1. Electromechanical Erection of 100 GAMESA G52 turbines
  2. Erection of two meteorological towers each of 45 m height
  3. Engineering, supply and erection of permanent power supply for site offices
  4. Engineering, erection and commissioning of wind farm 220 KV S/S telemetry
  5. Turbine blade washing and inspection during 3 year warranty period
  6. Medium voltage grid (100 kiosks including transformer, switchgear and cable) periodic and corrective maintenance during 3 year warranty period
  7. low voltage cable between generator and ground controller replacement. ( 100 turbines)

Zafaran KFW VI 80 MW Wind farm (94 G52 Turbine)

petrotec 026

 Scope of work:

  1. Erection of one meteorological tower of 45 m height
  2. Engineering, supply and erection of permanent power supply for site offices
  3. Engineering , erection and commissioning of wind farm 220 KV S/S telemetry
  4. Turbine blade washing and inspection during 3 year warranty period
  5. Medium voltage grid (94 kiosks including transformer, switchgear and cable) periodic and corrective maintenance during 3 year warranty period
  6. low voltage cable between generator and ground controller replacement.

Zafaran KFW II & III Wind farm (71 Vestas V47 Turbine)

Zafaran DANDIA III Wind farm (46 Vestas V47 Turbine)

petrotec 026

 Scope of work:

  1. Erection of one meteorological tower of 42 m height
  2. Engineering, erection and commissioning of wind farm 220 KV S/S telemetry
  3. Medium voltage grid (71 kiosks including transformer, switchgear and cable) periodic and corrective maintenance during 3 year warranty period.
  4. Engineering, erection and commissioning of wind farm 220 KV S/S telemetry

Zafaran JBIC 120 MW Wind farm ( 142 GAMESA G52 Turbine )

 Scope of work:

  1. Engineering, supply and erection of permanent power supply for site offices
  2. Engineering, erection and commissioning of wind farm 220 KV S/S telemetry
  3. Electromechanical erection of 142 Kiosks’ air conditioning units
  4. Turbine blade washing and inspection during warranty period
  5. Medium voltage grid (142 kiosks including transformer, switchgear and cable) periodic and corrective maintenance during warranty period.

Zafaran DANIDA 120 MW ( 142 GAMESA G52 Turbine )

 Scope of work:

  1. - Engineering, Supply , erection and commissioning of wind farm 220 KV S/S telemetry
  2. - 142 kiosks monitoring system engineering , supply, erection and testing
  3. - 12 Blade recycle
  4. - Turbine blade washing and inspection during warranty period
  5. - Power cable between generator and ground controller replacement ( 142 turbines )

Gabal Al Zait KFW 200 MW ( 100 GAMESA G80 Turbine )

 Scope of work:

  1. WTG Nacelle , Hub inspection and maintenance at Alexandia Port before shipment to site
  2. Nacelle damaged Fiber during transportation repair at Alexandria Port
  3. Engineering, supply and erection of permanent power supply for site offices
  4. Project spare part handling and storekeeping management

Gabal Al Zait JICA 220 MW ( 110 GAMESA G80 Turbine )

 Scope of work:

  1. WTG Nacelle , Hub inspection and maintenance at Alexandia Port before shipment to site
  2. Nacelle damaged Fiber during transport repair at Alexandria Port
  3. Blade cleaning and repair ( in cooperation with our service partner COMANTUR )
  4. Blade cage dismantle and WTG transport tools component prepare for reshipping to Spain
  5. MV network installation :
    • MV Switchgear Installation inside WTG
    • MV cable pulling and termination
    • Fiber optic cable pulling and termination
    • Earthing cable pulling
    • MV cable trenches and rood crossing implementation ( excavation ,……… )
  6. Operation and Maintenance during warranty period in progress

Gabal Al Zait FIEM 120 MW ( 110 GAMESA G80 Turbine )

 Scope of work:

  1. WTG Nacelle , Hub inspection and maintenance at Alexandia Port before shipment to site
  2. Nacelle damaged Fiber during transport repair at Alexandria Port
  3. Blade cleaning and repair ( in cooperation with our service partner COMANTUR )
  4. Blade cage dismantle and WTG transport tools component prepare for reshipping to Spain
  5. Contaminated waste management
  6. WTG elevator installation in cooperation with AVANTI
  7. Operation and Maintenance during warranty period In progress

Gabal Al Zait KFW EXT 40 MW ( 20 GAMESA G80 Turbine )

 Scope of work:

  1. - WTG Nacelle , Hub inspection and maintenance at Alexandia Port before shipment to site
  2. - Nacelle damaged Fiber during transport repair at Alexandria Port
  3. - Blade cleaning and repair ( in cooperation with our service partner COMANTUR )
  4. - Blade cage dismantle and WTG transport tools component prepare for reshipping to Spain -

Gabal Al Zait RGWE BOO 250 MW ( 125 GAMESA Turbine )

 Scope of work:

  1. WTG Nacelle , Hub inspection and maintenance at Alexandia Port before shipment to site
  2. Nacelle damaged Fiber during transport repair at Alexandria Port
  3. WTG elevator installation in cooperation with AVANTI
  4. Contaminated waste management

Jordane Ma’an Wind Farm 80 MW ( 40 GAMESA G97 Turbine )

  Scope Of Work IN PROGRESS :

  1. - Operation and Maintenance

Jordane Al Rajaf Wind Farm 80 MW ( 40 GAMESA G114 Turbine )

  Scope Of Work IN PROGRESS :

  1. - Operation and Maintenance

Zafrana 1&3 ( 94 kiosk )

  Scope Of Work :

  1. Maintenance , repair ,supply and replacement of damage parts of 94 kiosk at zafrana
    • MV load break switches
    • Transformer
    • Control and protection circuit